MIPP Experiment Logo

Document List by Event Group

These documents from Collaboration Meetings are available:

MIPP-doc-# Title Event(s) Author(s) Last Updated
211-v1 E907 Offline Status, Needs for the Upgrade MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Mark D. Messier et al. 28 Apr 2007
210-v1 Quantitative Answers for PAC MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Nikolai Mokhov et al. 28 Apr 2007
209-v1 TOF Electronics for MIPP Upgrade MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Carl Rosenfeld 28 Apr 2007
208-v1 CKOV MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Winslow Baker 28 Apr 2007
204-v2 A Pixel Detector for MIPP using "BTeV Pixels" MIPP Upgrade Collaboration Meeting (28 Apr 2007)
David C. Christian 28 Apr 2007
207-v2 Status of MIPP Upgrade MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Rajendran Raja 27 Apr 2007
206-v1 Calorimeter Electronics MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Boris Baldin et al. 28 Apr 2007
205-v1 Plastic Ball Electronics MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Boris Baldin 27 Apr 2007
203-v1 Mechanical Preliminary Design Layout for MIPP Upgrade MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Edward C. Chi et al. 27 Apr 2007
202-v1 TPC Electronics Status, Plans, Needs MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Marc Larwill 27 Apr 2007
201-v1 Chamber electronics TDC's MIPP Upgrade Collaboration Meeting (28 Apr 2007)
JinYuan Wu 27 Apr 2007
199-v1 Veto Wall Construction MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Mike Sadler 26 Apr 2007
198-v1 Jolly Green Giant Coil Fabrication status and Plan MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Jim Kilmer 26 Apr 2007
197-v2 Chamber electronics Issues, prototypes MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Sten Hansen 28 Apr 2007
196-v1 Ziptrack Upgrade MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Michael J. Roman 27 Apr 2007
195-v1 Cryogenic Target Upgrade MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Terry Tope 28 Apr 2007
189-v2 Trigger Overview MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Holger Meyer 27 Apr 2007
188-v1 Missing Baryon Resonances-getting quantitative MIPP Upgrade Collaboration Meeting (28 Apr 2007)
Igor Strakovsky 25 Apr 2007
183-v1 E907 Offline Analysis Status, Needs MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Andre Lebedev et al. 12 Apr 2007
182-v1 Calorimeter electronics MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Durga Rajaram 12 Apr 2007
181-v1 CKOV fixes MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Winslow Baker et al. 12 Apr 2007
180-v1 ToF electronics MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Andrew Godley 12 Apr 2007
179-v1 Chamber electronics Status, Plans, Needs MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Sten Hansen et al. 12 Apr 2007
178-v1 TPC electronics Status, Plans, Needs MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Marc Larwill 12 Apr 2007
177-v1 Silicon Trigger electronics MIPP Upgrade Collaboration Meeting (09 Dec 2006)
David C. Christian et al. 12 Apr 2007
176-v1 JGG Fix + Ziptrack MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Leon H. Beverly et al. 12 Apr 2007
175-v1 TPC Move MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Leon H. Beverly et al. 12 Apr 2007
174-v1 Cryogenic Target Upgrade MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Terry Tope 12 Apr 2007
173-v1 Plastic Ball Electronics MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Boris Baldin 12 Apr 2007
172-v1 Plastic Ball Mounting and Electronics MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Herbert Loehner 12 Apr 2007
171-v1 Welcome- PAC recommendations- Upgrade status MIPP Upgrade Collaboration Meeting (09 Dec 2006)
Rajendran Raja 12 Apr 2007

Number of documents found: 31

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact HelpDesk



DocDB Version 8.7.18, contact MIPP Document Database Administrators
Execution time: 0 wallclock secs ( 0.29 usr + 0.03 sys = 0.32 CPU)